How to schedule maintenance during an operating shift - When is 8 hours equal to 5
Applying lessons learned from the service industry into manufacturing
Error proofing - How referencing a Tom Hanks movie has taught me about error proofing in MRO
An MRO for the unrefurbished: How to build a spares strategy in manufacturing that includes unrefurbished parts
Applying my first lesson from Baltimore’s Francis Scott Key Bridge failure
A 9 3/4 mindset going into your shutdown
How did the stop sign get there?
Ideas are not rare.
Zugzwang moments within performance goals
Canceling a PM can impact your metrics differently.
Mildew on roses makes no wine.
Your outage's duration shouldn't be divisible by eight all of the time.
Follow-up investigations with binary classifications
Which asset management metrics should you start with?
What is compliance when doing PMs?
Complacency after commissioning shut this production unit down.
Where is it? I don't see it.
Stop gerrymandering the asset hierarchy
Layers of protection, and still mismatch errors.
Tina Fey could be your consultant for your feasibility analysis.